济南卷帘门厂快速卷帘门如何安装最高效
2014-3-18 11:18:24
 

1.济南卷帘门厂安装人员在安装前必须熟悉快速门的安装图纸,检查线路是否到位,并做好其他安装准备,包括需要用到的零部件,工具等

   1 installation personnel must be familiar with the rapid door installation drawings before installation, check the lines are in place, and make other preparations for installation, including the use of spare parts, tools etc..

2.安装前还必须检查门的尺寸与洞口尺寸是否相符;导轨支架的数量是否正确;洞口预埋件,支架埋件位置是否正确等等。

2 pre installation must also check the size of the door and the size of the hole are matched; the number of guide rail bracket is correct; the embedded part, support embedded parts are in proper position.

3.工艺流程大致分为:洞口处理,弹线,固定卷筒传动装置,空载试车,装帘板,安装导轨,试车,清理。

The 3 process can be divided into: hole processing, wire, fixed drum transmission device, no-load test, loading board, installation guide, commissioning, cleaning.

4.洞口处理:复核洞口与产品尺寸是否相符,一般洞口宽度和高度不宜大于5m,复核预埋件位置和数量。

4 hole processing: check the product size is consistent with the general opening, width and height should not be more than 5m, check the position and number of embedded parts.

5.济南卷帘门厂弹线:测量洞口标高,弹出两导轨垂直及卷筒中心线。

5 bullets: measuring the elevation line, pop two rail vertical and drum center line.

6.固定卷筒、传动装置:将垫板电焊在预埋铁板上,用螺丝固定卷筒的左右支架,安装卷筒,卷筒安装后应转动灵活,安装减速器和传动系统,安装电气控制系统。

6 fixed drum, transmission device: the plate welding in embedded on the iron drum, installed with left and right bracket, screw fixed drum, drum after installation should be flexible rotation, installation reducer and transmission system, installation of electrical control system.

7.空载试车:通电后检验电机,减速器工作情况是否正常,卷筒转动方向是否正确。

7 no-load test: test after the motor is energized, reducer is a normal situation, drum rotation direction is correct.

8.装帘板:将帘板拼装起来,然后安装在卷筒上。

8 loading board: board together, and then mounted on spool.

9.安装导轨:按图纸规定位置,将两侧及上方导轨焊牢于墙体预埋件上,并焊成一体,各导轨应在同一垂直平面上。

9 Installation Guide: according to drawing position, both sides will be above and rail welding in the wall embedded parts, and welded into a whole, the guide should be in the same vertical plane.

10.试车:先手动试运行,在用电机启闭数次,调整至无卡住,阻滞及异常噪音等现象为止,启闭的速度符合要求。全部调试完毕,安装防护罩。

The 10 test: the starting dynamic test run, in the motor hoist several times, to no jamming, block and abnormal noise phenomenon, opening and closing speed to meet the requirements of. All finished debugging, installation of protective cover.

11.清理:粉刷或镶砌导轨墙体装饰面层,清理现场。

11 cleaning: stucco or lined guideway wall surface decoration, cleaning up the site.