介绍防火卷帘门工程施工管理措施
2016-2-18 10:19:30
介绍防火卷帘门工程施工管理措施
Introduce fire shutter project construction management measures
1、 施工管理要点:施工的前期准备,应明确施工要求和完成日期,并将责任落实到人。内容包括:施工项目及范围的明确;施工图纸资料的准备;施工方案的编制;施工技术交底的编制、组织内部培训、材料器具的准备、施工质量要求以及施工标准的掌握。尽量将各项工作解决在施工之前。济南卷帘门厂
1, the key points of construction management, construction preparation, construction requirements be defined, and the completion date, and will be responsible to people. Contents include: scope of construction projects and clear; Preparation of construction drawings; Construction plan of the establishment; Construction technical clarificaiton, organize internal training, material preparation, construction quality and construction standards. As far as possible will solve all work before construction.
2、对于施工图不全的部分,要随时与业主、设计单位及监理保持联系 对条件尚未成熟的必须得到业主的同意,并办好洽商配合施工。发现图纸与相关标准有冲突处,要以标准为主或与设计单位、业主共同商议解决,以保证其使用功能。
Part 2, for the construction drawing is not complete, should always keep in touch with the owner, design unit and supervision The condition is not yet ripe for must obtain the consent of the owner, and do a good job in negotiations with construction. Find any conflict between the drawings and related standards, or to give priority to with the standard and design unit, the owner together to solve, to ensure that its use function.
3、 工程原则上以经过设计单位或建设单位批准生效的施工图纸和相关技术文件进行施工,施工中如发生设计变更洽商需要建设单位、设计单位、监理单位、施工单位四方签宇认可万可生效,技术质量 标准按照施工设计图、施工验收规范及相关标准进行。
3, engineering principle, with the approval of design unit or the construction unit into the construction drawings and related technical documents for the construction, the construction of any design changes regarding the need to construction units, design units, supervision units, construction units square sign yu recognition is effective, technical quality standards in accordance with the construction drawings, construction acceptance specifications and related standards.
4、对施工进度、质量、安全、技术设备材料供应、运输、成品加工、成品保护、技术资料归档等问题,都要在施工中编制与之相对应的行之有效的对策。
4, the construction progress, quality, safety, technology and equipment material supply, transport, product processing, product protection, technical data archive, is compiled in the construction and the corresponding effective countermeasures.