影响卷帘窗安装定位的因素
2017-9-4 17:59:14

一、 安装前的准备。

First, the preparation before installation.

1、 检查现场应具备了安装的必要条件,如已经通电,洞口平整、规一。

1, the inspection site should have the necessary conditions for installation, such as the power has been electrified, the hole ion, regulation one.

2、 复核门洞尺寸应与工程备料单上的洞口尺寸、现场条件一致,如果原尺寸测量错误或现场条件勘测不准确,应及时向公司反应。

2, check the size of openings should be the same size, and the preparation of single hole on engineering field conditions, if the original size measurement errors or conditions in the field survey is not accurate, should be timely response to the company.

3、 检查随身携带的工具应能完成安装任务。

3, check the tools should be able to carry out the installation task.

4、 对卷帘门进行拆包检查,应无明显的少件、漏件的现象。

4, rolling doors for unpacking examination, there should be no obvious small pieces, leakage of parts.

5、 与工程备料单进行对比,对帘片、导轨、卷帘轴、端盖板等主要部件的长度及制作方式进行检查,应无明显的影响卷帘窗安装、运行的错误或误差存在。

济南卷帘门厂哪家好

5, and engineering single preparation were compared, the main components of the curtain sheet, guide rail, rolling shaft end cover, the length and production methods are examined, there should be no obvious effect of rolling shutter installation and operation errors or errors.

二、水晶卷帘门安装方法:

Two 、 installation method of crystal rolling shutter door:

1、首先看手动链条是否向下,在将电机固定在主板上,在把链条固定在轮盘和电机底座齿轮连接(一定上紧)在将遥控接线盒与电机连接,试下手柄是否颠倒,如颠倒遥控接收盒侧方有黑色按键,向另一方拨动助即可。

1, first look at the manual chain is down, the motor is fixed on the motherboard, the chain wheel and the motor base is fixed on the gear connection (must tighten) in the remote control box is connected with the motor, try the handle is upside down, such as the black box upside down remote receiving lateral button, to the other party a will you can.

2、用尺子量主板和副板的外边看下尺寸是否正确,如正确把轴上在侧板上,注意要先把轴打一条水平线,再用10个钻头打孔50公分,1个一定要直,再用14的镙母焊在轴上,记住要与轴上的孔垂直在焊,一定要焊牢固,再把帘子的第一片的中心与轴上的孔对齐用10个的钻头打孔一定要垂直(也可以用快丝固定)。

Outside 2, ruler of the main board and the auxiliary board to see if the size is correct, the correct axis on the side plate, attention should be put on a horizontal axis, with 10 holes 50 cm, 1 must be straight, and then 14 of the nut is welded on the shaft, and remember to on the axis of the vertical hole in the welding, welding must be solid, then the holes curtain the first piece of the center shaft of the drill bit and drill 10 must be vertical (can also be used to fast wire fixation).

3、把轨道的一端开成人字口。

3. Turn one end of the track into an adult mouth.

4、把卷帘门帘子调平,上下线定位,左边滑轮是上限位,右边是下限位,(根据现场需要自行调节)。

4, roll up the door curtain leveling, upper and lower line positioning, the left pulley is upper limit, the right is the lower limit (according to the needs of the site to adjust).

5、在将卷帘门帘片穿好两侧用封头封好用拉铆钉拉住(记住开始封各一片封一个)。

5, in the rolling curtain film, wear both sides with head sealed, with pull rivet pull (remember to start sealing each one).

6、封完后用绳翻过轴把帘子打个孔一头一个用绳拴住,别一端用人拽住,按下手柄的上升键,使轴运行将帘子带上去,镙丝杆把帘子和轴连在一起(水平要拧紧加垫)再把帘子升上去,一定要牢固。

6, after using the rope over the shaft to make a hole in a curtain head with a rope, don't end with a man grabbed the rising key press the handle, the shaft will bring up the curtain, curtain rod and screw shaft together (horizontal to tighten with PAD) put up the curtain. We must firmly.

本文由济南卷帘门厂为您提供,我们的网站是:/我们将以全心全意的热情为您提供更优质的服务,欢迎您的访问!

This article by the Ji'nan rolling shutter door factory for you to provide, our website is: /, we will wholeheartedly enthusiasm for you to provide better service, you are welcome to visit!

友情链接:环球彩票平台  云顶彩票  欢乐彩票app  盛兴彩票app  苹果彩票官网  盛兴彩票  大发彩票投注  

免责声明: 本站资料及图片来源互联网文章,本网不承担任何由内容信息所引起的争议和法律责任。所有作品版权归原创作者所有,与本站立场无关,如用户分享不慎侵犯了您的权益,请联系我们告知,我们将做删除处理!